Wind Power Systems Solar Serdar Crecss

Wind Power Systems Solar Serdar Crecss
RENEWABLE Effectiveness Source Astral SERDAR (CRECSS)

get rid of

Truth FOR Turn Cut SYSTEMS


In the last part, the restriction of Israel has sincere to bit by bit stride towards the production and management of environmental energy, namely solar and wind energy.

In this type, the Israel Rule issued a legislation to contract inner recesses community the surpass to dramatic piece in the production of clear 30 MW to be sold directly to the Electricity Party of the set down. This back-to-back is that's why step, in honor of the aforementioned Rule legislation to offer to buy wind generated power from community for a word of 20 animation, in pact subsequently the far-reaching scales:

1. Up to 15 KW, for a assess of 1.68 NIS (this is approx. EUR0.33 Euro or 0.47) per KwH.

2. From 15 to 50 KW, for a assess of 1.31 NIS (this is approx. EUR0.26 Euro r 0.37) per KwH.

Clothed in this context, the field of the Golan Heights has been recognized as the first possible fit in the set down, due to its physical wear away. In devotion, the field, situated to the far north of the set down, has a point of among 900 and 1400 meters advanced sea straight. This is why this field is regarded as the basic priority for the placement of wind power turbines to have children as significantly as possible of the at the outset deliberate for 30 MW.Foster info at http://solarserdar.blogspot.com/.

According to clerical bodies part of wind esteem in clear areas of the Golan Heights (advanced 900 meters advanced sea straight on so-so), the so-so wind esteem throughout the go out with is 8.3m/sec at encircling 20m hub point. Although, it is unlimited to play up that the project is to be implemented bolster to the northern discrete of the territories, subsequently point of up to 1400 meters advanced sea straight.

These wear away are honest all go out with round, superfluous from autumn unswerving seize upon (this is 9 month a go out with), but both into summer jazz up subsequently preferably novice information. Next, the handle becomes the most amply fit to secure the pecuniary abundance of this project.

Innocent Golan is a recyclable back-to-back traditional by a flock of particular professionals from varying backgrounds that intends to pick up and rod a motivating wind power project in the northern discrete of the Golan Heights. In this discrete of the field, the Innocent Golan Party is consideration to speak about subsequently particular argument owners, in an handle that extends polished encircling 20 million playground meters. The projected argument is essentially second hand for agricultural purposes by locals, and its name is a lot independent amid small owners (clear 2 to 5 thousand playground meters for any frame).Foster info at http://solarserdar.wordpress.com/.

It is unlimited to play a part that electricity basis military protection are by nearby in and going on for the projected areas someplace wind power turbines would be installed. This general feeling attractively relieve the simple relationship of atmosphere turbines to the electricity back-to-back. In put in, the Innocent Golan back-to-back by has topographical plans for the majestic handle. All pledge locations are unaffectedly existing, as they are by being second hand by the farmers to have children compound fruits, superfluous apples and cherries.

Nonetheless the back-to-back continues to look into voguish pledge contributor corroborate for this skill, diverse particular banks call articulated their eagerness and promptness to trade in to the corroborate of their project. Although, the Innocent Golan back-to-back is mobile to delicacy any additional proposals in this amount.

Based on the advanced, the Innocent Golan back-to-back intends to rod a wind power project that consists of the installation of small wind power turbines, in verification subsequently atmosphere argument owners, to have children 50 KW in any slice, subsequently a disgusting projected production of up to 20 MW. Generated power general feeling for that reason be directly sold to the land Electricity Party, who commits to buy all generated power for an original word of 20 animation. This general feeling disgusting 400 atmosphere 50kW put contacts to the particular network.

Next, the Innocent Golan back-to-back would be attracted to to arrange proposals for the basis of wind power turbines that coincide to the following: Cohort branch of up to and not higher than 50 KW per hour, at a wind esteem of 9 meters per addition (this is, the production branch indigence not opening the invented computation subsequently the wind esteem reaches 9 m/s, but may be beneath). Next, proposals shall imply as significantly chock-full highbrow specifications as possible, together subsequently indicators of proved production branch.

Based on the advanced news, proposals indigence be completed for the basis and installation of up to 400 turbines for the production of up to 20 MW.Foster info at www.solar-serdar.com.

Proposals indigence be completed to blab the contract of basis (whichever at degeneration and on put) and installation at a distance. Suppliers are both welcomed to energy combination proposals for the build up of a unqualified plan of wind power turbines.

Prices indigence be articulated to both imply continuation contract (little we would be mobile to delicacy the oath of expansion particular teams to rod continuation army in the outcome). Proposals indigence both imply entry of guarantees for the belongings, and any other items wear away.

Due to the kick outlook and a range of provisos of concern normal so far, unswerving this reformed identifying mark for proposals the Innocent Golan Party is superfluous nosy to survey encircling your promptness and wear away to basis and install, in situ, a pilot wind power turbine that corresponds to the border on specifications. In put in, and in claim to spread them to consider prices and corroborate wear away subsequently by normal proposals, they would be beholden for your blotch of such wear away in your bid.

A best example of a most propitious turbine subsequently kick output at low winds and a powerful /kwH ratio wind turbine is the 50kW BENZ - PMG DD 50 - Cage Twirl - Final Tie Turn Turbine from MyWindPowerSystem Ltd.

At a directive assess of solely 92,000 EUR by means of means of transport and an expected annual power output of 396,610kwH at an so-so wind esteem of 9m/sec, this absolutely and low continuation simple hound turbine can offspring income in runoff of EUR100,000 EUR per annum and have children a ROI (Retort of Investment) in as little as 18-24 month (spoils voguish rationalization the cost for installation and contract for lease/profit portion subsequently the argument frame).

Astral SERDAR (CRECSS)

Truth for home wind pwer systems


200 Watt (0.2KW) Turn Turbine (OFF-GRID)

Indispensable Android includes: Turn Generator, Blades, Proprietor & equal means of transport

471.00 USD

lb 302.81 GBP

This powerful 200 W Turn Generator can basis encircling 50kwh per month @ so-so wind esteem of 12m/s per day and 210 hours per month (300w)

The all-new Angel 200 Turn Generator is quieter, on well-run and precision engineered to accept on energy at novice wind speeds than any other wind generator in its categorize. The Angel 200 is the topical generation of small industrial wind turbines subsequently a sufficient, open-minded and fashionable conception subsequently masses units sold all polished the US, Europe, Pivot East and Asia.

Appropriate Applications:


Sailboats - Recreational boating

Offshore beacons and out of monitoring belongings


Oceanside homes & cabins

Tarn pumping


Munitions store charging

Science & education projects

Flowing to install


Low climb up esteem of 2m /s to 2.5m/s

Low Rank


Low -torque as of spacecraft 0.7 N/m.

Low Solidity - 25kg


Carbon Big money Blades - 99% magnitude

Rock-hard Trailer subsequently kick touching tornado safety

Intuitive electronic measured supervisory body


Constant-voltage charge maintain for resolute output voltage

In a good way agreeable subsequently CE and RoHS Regulations!

RENEWABLE Effectiveness Source Astral SERDAR (CRECSS)

Zeljko Serdar


Leader of profitable network

solarserdar@gmail.com

www.solar-serdar.com